Raise path at Lade crossover

This work section describes the action required to alter the level of the existing East bank path where the path bridges the Mill Lade just before it reaches the river.  At present the section of path above the two large culvert pipes floods on occasion to a depth of 300mm on occasion.  In addition to the flooding problem the incline of the path down to the culvert area is steep and could present a problem for wheelchair users.

Accordingly it is proposed to raise the level of the path at its lowest point by 450mm and easing the slope up to the existing path system leading to the footbridge.  The method of raising the path levels will be as previously described in Section 9 with the diameter of the six drain relief pipes being increased to 200mm.  The surface of the new path will be carried out in tarmacadam to match the adjoining paths.  

 

Back to Top

Last updated:Friday August 18, 2006