|
|
|
Repairs to RiverbankThis section of work relates to a limited length of 15 metres of East riverbank which has been built up in stone and concrete block to form a manmade banking. Flooding and erosion over the years has taken its toll and a number of the concrete blocks have been displaced. The work proposed includes consolidation of the existing walling and replacement of concrete blocks as necessary.
|
|
Last updated:Friday August 18, 2006 |