Upgrade West bank gravel path

The initial path project carried out early in 2001 left a section of existing path with a dressing of gravel to improve the surface for walkers.  This length of path measures approximately 150 metres and it is proposed that this section be completed to the standard of the adjoining paths.  Drainage runs at the slope side of the new path which will require to be upgraded.  It is intended that the new path be constructed with in-situ concrete including an exposed aggregate finish in sympathy with the surroundings.

 

Last updated:Friday August 18, 2006